...
D. Requests for technology procurement and installation
- IRT: All technology requests must be submitted as "Non-Standard Space Technology Procurement" and approved by IRT using the IRT acquisition policy and procedures.
- Facilities: All facility requests for installation must be submitted using Facilities acquisition policies.
- The budget for requested technologies will be the responsibility of the requestor.
- The budget for requested project management (inclusive of all infrastructure requirements such as power, data, and installation) will be the responsibility of the requestor.
...
- All technology maintenance, support, repair, and replacement costs are the responsibility of the requestor/owner.
- All power related support is the responsibility of Facilities
- All cabling related support is the responsibility of IRT
G. Infrastructure, Installation, AV, and Technology Standards: Facilities is responsible for
...
Title: Addendum to Conference Room and Non-Classroom Space Technology Conference Room and Non-Classroom Space Technology Policy. Standards and Specifications, Addendum
Subject: Information Technology
Policy No:
Applies: University-Wide
Issuing Authority:
Responsible Officer: Vice President and Chief Information Officer
Adopted:
Amended:
Last Revision: Dec 30,2014
Lenovo ThinkCentre M93p Tiny
10AACTO1WW
Preload Type
Standard_Image
Preload OS
WIN7_HP64
Preload Language
Windows 7 Home Premium 64 English
Platform
Tiny 65W
Floor Stand
VESA Mount Bracket kit - Tiny
Processor
Intel Core i5-4570T Processor (4MB Cache, up to 3.60GHz)
Memory
8GBx1 PC3-12800 DDR3 SoDIMM
1st HDD Drive
128GB_SSD_2.5"_SATA
Graphic Card
Integrated Graphics
1st Optical Drive
Slim DVD Burner/CD-RW, SATA
Keyboard
USB Fullsize - US English
Mouse
Edge Mouse
Audio Card
Integrated Audio
Ethernet
Integrated Intel Gigabit Ethernet
Internal Speakers
Internal Speaker Tiny
Publications
Publication English
Adobe Lightroom
Adobe Lightroom_5.0
3 Year On-site Warranty
3 Year Priority Technical Support
LCD Displays (55, 80, 90)
NEC E554, 55 inch
NEC V801, 80 inch
Sharp LC-90LE657U 90 inch
Projectors
NEC NP-M311X for smaller rooms
NEC NP-PA550W for medium-large rooms
AV Control
Pixie
Wall Inputs
VGA
HDMI
Audio 1/8 inch
Component
USB
Power
Video-Conferencing
Spec adapted for space and use
AppleTV
For untethered use of tablets and laptop computing
*Refer to AppleTV IRT Policies